Saturday, December 16, 2006

Side view of box showing shaping for 45 deg setting

Friday, December 15, 2006

Side view with motor fully up

Posted by Picasa Side view of saw before refitting the table which is held on by 4 "5/8 whitworth nuts.

top view showing outlet undet trunion

Posted by PicasaOverhead view of the internals showing the dust box fitted.

Tight clearance with motor full down

Posted by PicasaThe 2" stainless pipe only just clears with the motor in its fully down position. The grey angle connector and 60mm flexible pipe are required, as the end of the stainless pipe passes inside the casing in the 45 deg setting.

dust box fixing holes

Posted by PicasaThe two holes at the left hand side use the original deflector plate "1/4 whit fixing bolts. The right hand bracket requires drilling and tapping the trunion .

Dust collection box cut away for 45 deg

Posted by PicasaShaping of the box is critical in order to have clearance when the arbour is set at 45 deg.